Motor Insertion Machinery: How Can Rapid Changeovers Be Achieved in Mixed-Line Production of Small Batches and Multiple Varieties of Magnets?

磁钢混线生产换型时间长是插磁车间痛点,模块化夹具与参数记忆可大幅压缩。

Q: Where does the biggest waste of time occur in mixed-line production?

It’s not about changing the fixture itself, but rather finding the right program, adjusting parameters, and running test runs. We analyzed the data from a client’s magnetic insert workshop in Dongguan and found that the average downtime for changeovers was 47 minutes, of which fixture replacement accounted for only 8 minutes; the remaining 39 minutes were spent adjusting insertion depth, positioning speed, and the orientation of the magnetic inserts. The reason for this was that the program names stored on each machine were disorganized, and operators entered them based on experience.

Finished Inserted Magnet Products
Finished Inserted Magnet Products

Q: What are the key steps to implementing quick changeovers?

Step 1: Design the fixture with a quick-change mechanism using pneumatic locking or positioning pins, with the goal of reducing fixture changeover time to less than 3 minutes; Step 2: Create a product recipe library in the PLC, saving settings for magnet length, insertion depth, and insertion speed under model-specific names so they can be automatically loaded upon retrieval; Step 3: Set up mandatory first-piece verification; automatic operation is only enabled after 10 consecutive pieces pass inspection. After implementing SMED, this client’s changeover time was reduced from 47 minutes to 15 minutes.

Water Pump Motor Rotor Equipment
Water Pump Motor Rotor Equipment

Q: How can errors be prevented on mixed-product production lines?

在料仓入口加视觉识别,比对磁钢尺寸和当前配方是否一致;插装工位前增加光电检测,确认磁钢极向。我们曾经遇到一批N42和N48混料的情况,视觉分选后拦截了12片错料。另外建议把相似型号错开排产,颜色或高度差异小的磁钢不要连续换型,给操作工留出核对时间。

New Energy Drive Motor Magnet Inserting Machine
New Energy Drive Motor Magnet Inserting Machine

Previous. NEXT STORY.

Recommended