Automated Motor Assembly Line: How Should the Airtightness Testing Station Be Set Up to Prevent Missed Inspections?

电机装配线气密性测试影响IP防护等级,设置压力与时间参数是关键。

Q: Which parts of the motor must undergo airtightness testing?

壳体焊缝、出线口、端盖与机壳配合面是最常见的泄漏点。特别是新能源驱动电机和水泵电机,客户通常要求IP67以上。我们去年验收的一条水泵电机线,把气密工位放在总装后端、涂装之前,测试压力设定为25kPa,稳压5秒后检测泄漏率,漏判率从之前的1.2%降到了0.15%。

Motor Rotor Assembly Line
Motor Rotor Assembly Line

Q: How are the test pressure and hold time determined?

一般参照ProductGenerally, the settings are based on the product standard, with an increase of 20%. For IP67 motors, the typical test pressure is 15–30 kPa, with a pressure hold time of 3–10 seconds; if the product requires IP68 or higher, it is recommended to increase the pressure to 50 kPa or higher and maintain it for 10–15 seconds. It is important to note that the housing temperature must be equilibrated with the ambient temperature; if the temperature difference of a housing that has just come off the welding station exceeds 5°C, testing errors may be amplified by a factor of three.

Automatic Assembly Line
Automatic Assembly Line

Q: How can we prevent false positives and missed detections?

First, inspect the fixture O-rings once per shift and replace them immediately if worn; second, calibrate using a standard leak hole after each changeover; if the calibration deviation exceeds ±10%, shut down the machine to investigate; third, link the test data to the housing’s QR code to facilitate traceability. We generally use a three-tier classification system: if the leakage rate is less than 50% of the standard value, the product is released directly; if it is between 50% and 100%, it is marked for observation; and if it exceeds 100%, it is automatically rejected and sent to the maintenance station.

Jiuju Automation-Brushless motor automated production line